Add SCM functional knowledge domain (#192)

* Add SCM functional knowledge domain

Introduce nine source-backed rules with original AL sample pairs, bounded SCM review routing, and complete positive/clean evaluation coverage.

Co-authored-by: Copilot App <223556219+Copilot@users.noreply.github.com>

* Normalize SCM knowledge and review ownership

Align article and AL sample conventions, keep BC facts separate from review mechanics, and clarify reciprocal Finance ownership without bespoke shared test assertions.

Co-authored-by: Copilot App <223556219+Copilot@users.noreply.github.com>

---------

Co-authored-by: Jesper Schulz-Wedde <jesper.schulzwedde@microsoft.com>
Co-authored-by: Copilot App <223556219+Copilot@users.noreply.github.com>
This commit is contained in:
Jesper Schulz-Wedde 2026-09-21 10:16:44 +02:00 • committed by GitHub
parent d38377b85e
commit bec8890b7e
No known key found for this signature in database
GPG key ID: B5690EEEBB952194
34 changed files with 1030 additions and 10 deletions

View file

@ -0,0 +1,43 @@
---
bc-version: [all]
domain: scm
keywords: [requisition-line, action-message, accept-action-message, req-wksh-make-order, carryoutbatchaction, demand-order-no, planning-flexibility]
technologies: [al]
countries: [w1]
application-area: [all]
---
# Carry out requisition actions through the standard workflow
## Description
A requisition/planning line is a pending change to a supply/demand network, not just a template for a purchase line. Carry-out interprets New, change-quantity, reschedule, and cancel actions, preserves referenced supply and planning flexibility, and moves reservation/tracking ownership before finalizing the proposal. Creating a plausible purchase order and deleting the requisition line can leave new supply unrelated to the demand that caused it.
## Best Practice
Requisition batch carry-out initializes `"Req. Wksh.-Make Order"` with `Set` and invokes `CarryOutBatchAction` on the intended accepted lines. Order/posting/receipt defaults are separate from the ending-order-date cutoff, and worksheet/batch/line filters define the selection. A plain `Run` or a single order-line insertion helper is not a replacement for this batch initialization and finalization.
The standard `"Carry Out Action"` dispatch handles broader planning output and its configured purchase, transfer, assembly, or manufacturing choices. Each action's supply change and source-specific reservation transfer precede proposal finalization; not every action creates a new purchase order.
Ordinary manual purchase creation that does not consume planning output is outside this rule. Users may reject or delete unwanted proposals without creating supply; temporary planning simulations, pre-carry-out enrichment, and engine-owned cleanup are also legitimate. `Delete(true)` on a requisition line is not intrinsically a defect.
The samples select an existing accepted New/Purchase item proposal with sales-demand context. Dates are explicit, the source selection remains bounded, and the clean sample leaves order creation and reservation handoff to the standard workflow; it is not a complete planning-run generator.
See sample: [`carry-out-requisition-actions-through-the-standard-workflow.good.al`](carry-out-requisition-actions-through-the-standard-workflow.good.al).
## Anti Pattern
Manually creating or changing supply from a subset of an accepted persistent `"Requisition Line"`, then deleting or marking that proposal handled, skips the standard carry-out/source-reservation handoff. Purchase-field validation and the requisition delete trigger do not first move the proposal's demand links to the new purchase line.
Deleting an unwanted suggestion or creating an ordinary purchase order without consuming planning output is a separate operation. The standard carry-out engine's own insert/delete sequence participates in the source handoff rather than replacing it.
See sample: [`carry-out-requisition-actions-through-the-standard-workflow.bad.al`](carry-out-requisition-actions-through-the-standard-workflow.bad.al).
## References
- [Perform planning action messages](https://learn.microsoft.com/en-us/dynamics365/business-central/production-how-to-run-mps-and-mrp#to-perform-action-messages)
- [Planning functionality](https://learn.microsoft.com/en-us/dynamics365/business-central/production-about-planning-functionality)
- [Reservation, order tracking, and action messaging](https://learn.microsoft.com/en-us/dynamics365/business-central/design-details-reservation-order-tracking-and-action-messaging)
- [BaseApp carry-out caller and date defaults](https://github.com/microsoft/BCApps/blob/8f7a04cb0db8aa96cb97e055c45c61aead49e280/src/Layers/W1/BaseApp/Inventory/Requisition/CarryOutActionMsgReq.Report.al#L116-L133)
- [Batch initialization and selection](https://github.com/microsoft/BCApps/blob/8f7a04cb0db8aa96cb97e055c45c61aead49e280/src/Layers/W1/BaseApp/Inventory/Requisition/ReqWkshMakeOrder.Codeunit.al#L116-L215)
- [Reservation handoff before supply finalization](https://github.com/microsoft/BCApps/blob/8f7a04cb0db8aa96cb97e055c45c61aead49e280/src/Layers/W1/BaseApp/Inventory/Requisition/ReqWkshMakeOrder.Codeunit.al#L663-L743)